PROJECT: Bedel’s Marathon Gas Station Remediation
Bedel’s Marathon Gas Station Remediation
Gas station Remediation Project with petroleum impacted soil and groundwater.
Activities: Performed remediation under IDEM LUST ELTF Section, UST removal, Injection, CAPR monitoring, and reporting.
- Leaking Underground Tank Remediation
- UST Removal
- Injection
- CAPR monitoring
- IDEM Excess Liability Trust Fund (ELTF)
Project |
Bedel’s Marathon Gas Station Remediation |
---|---|
Project Location | Batesville, Indiana |
Client | Doug Bedel, President |
Contact | Doug Bedel, President 102 North Smith Street Batesville, IN 47006 (812) 934-3901 |
Dates | 2010 to present |
Status | Activities: Gas Station Remediation. Petroleum impacted soil and groundwater, remediation under IDEM LUST ELTF Section, UST removal, Injection, CAPR monitoring and reporting. |
Personnel | Jason Lougheed, Scott Lougheed |






